Wacker Drive Utilidor Project

Project Description

Client: City of Chicago
Location: Chicago, Illinois
Year Completed:  September, 2012
Value: $2,400,000

The Challenges

  • This project is a strategic partnership with AT&T where work is awarded based on a set list of unit pricing that has been submitted by JBCC. This decreases the time and money spent bidding smaller projects and creates a much more efficient system for improving AT&T’s telecommunication infrastructure.
  • This agreement covers work throughout Dallas, Ft. Worth, and all of the surrounding communities. Projects are typically awarded for Aerial and Underground forced relocates and new service connections.
  • This work entails a very large quantity of small projects that are spread throughout a large geographical area. JBCC crews must be extremely efficient and self-supporting in order to complete these projects in a timely manner. JBCC benefits from vast experience in planning, inspecting, and executing these jobs for AT&T.
  • Our projects under this contract provide occasional inaccurate or missing information for these projects. Being that these are very quick turnaround projects for AT&T service connections or repairs, the drawings and designs are adjusted in the field. JBCC crews are adept at locating a problem, creating a low cost solution, and communicating this solution with the AT&T Contract Coordinators. This high level of crew independence and clear channels of communication allow JBCCO to fulfill each project that is awarded.

Chicago River Bore

Project Description

Client: Sidera
Location:  Chicago, Illinois – Chicago River at Cermak
Year Completed:   2011
Value: $450,000

John Burns Construction Company installed conduit underneath the Chicago River via directional bore.

The Challenges

  • JBCC installed a 6-inch HDPE conduit underneath the Chicago River at Cermak Road via directional bore.
  • Bore was over 1,000-feet in length, and had to parallel 6-345kV Commonwealth Edison primary cables that were running in a tunnel beneath the river.
  • Despite encountering several unknown underground obstacles, including varying soils and old bascule bridge infrastructure, the shot was successful and completed on-time and within budget.

CMS Project

Project Description

Client: Illinois Department of Central Management
Location: Various locations in Central Illinois
Year Completed: February. 2013
Contract Value: $15,000,000

John Burns Construction Company installed over 1.1 million feet of conduit and fiber optic cable throughout Central Illinois for the Illinois Broadband Opportunity Partnership (IBOP) in 2012.

The Challenges

  • JBCC installed over 1.1 million feet of conduit and fiber optic cable throughout Central Illinois for the Illinois Broadband Opportunity Partnership (IBOP).

     

  • This project served to connect various cities and smaller municipalities throughout Central Illinois.

     

  • JBCC installed conduit primarily along Interstate Right-of-Way via vibratory plow and directional boring methods.

     

  • Fiber optic cable was installed by air jet, and spliced into various schools and universities along the route.

AT&T ACAS Program

Project Description

Client: AT&T
Location:  Northern Illinois
Year Completed: Ongoing

John Burns Construction Company is an ACAS Contractor for AT&T since the 4th Quarter of 2012. JBCC performs a variety of tasks, including open cut trenching, manhole reconstructions, duct bank construction and lowering and directional boring. These projects are in various locations throughout Northern Illinois and are part of AT&T’s effort to upgrade and maintain the existing system, as well as build new infrastructure.

The Challenges

  •  Open cut trenching
  • Manhole reconstructions
  • Duct bank construction and lowering
  • Directional boring

Small Cell Installation

Project Description

Client: Crown Castle, MasTec, T-Mobile, Verizon, Sprint, AT&T, SAC, Extenet. Mobilitie
Location: Various Locations in Chicago & Milwaukee
Year Completed:  2015 – Ongoing
Contract Value: $110,000,000+

The Challenges

  • JBCC is currently working with all four (4) major carriers (T-Mobile, Verizon, Sprint, AT&T) to expand 4G & 5G network in the Chicagoland Area.
  • The project has started in 2015 and is ongoing. To date JBCC has installed 1,100 small cell sites.
  • All sites are being installed on city of Chicago street and traffic poles and on ComEd wood utility poles.
  • To date we have trenched approx. 90,000 LF and directional bored approx. 100,000 LF for power and fiber.
  • Sweep & PIM testing are required on all equipment installed.

Fiber Optic Installation, I-355

Project Description

Client:  Illinois State Tollway Authority
Location:   Mountain View CA 94043
Year Completed:   2007

John Burns Construction Company successfully completed a fiber optic installation for the Illinois State Tollway Authority in the Southwest Suburbs of Chicago, IL in November 2007. This installation of communication equipment enables all IT systems to communicate with ISTHA main offices.

The Challenges

  • Installation of 16 miles of conduit and fiber optic cable for the new I-355 Tollway Extension between I-55 and I-80.
  • Installation of communication equipment enabling all IT systems to communicate with ISTHA main offices.
  • Splicing and termination of fiber cable into Tollway plazas.
  • Project was completed with the coordination of 7 other mainline contracts requiring large scale logistical coordination.
  • Project was completed ahead of schedule and contributed to a successful opening of the new extension.