27th Street Metra Pedestrian Bridge Replacement
• Demolition of existing pedestrian bridge at Metra Electric Station.
• Replacement of approximately 210’ long pedestrian bridge accessing Metra station platform.
• Installation of micro piles drilled into bedrock for new bridge support foundations.
• Original schedule called for removal of existing bridge and erection of new bridge over three weekend overnight periods. The work was completed in two weekend overnight periods.
Leave a Reply