John Burns Construction successfully completed the Wacker Drive Utilidor project in Chicago within budget and on time.

•   The Utilidor project consisted of installing 32 cell concrete encased duck bank below Wacker Drive as well as 6 cell concrete encased lateral duct banks at depths ranging in depth from 6’ to 25’.

•   The project also consisted of the installation of 10’cx5’x7’ mainline manholes and 4’x4’x6’ lateral manholes.

•   Due to thorough preconstruction planning, JBCC efficiently managed and completed the project on-time, within budget and with zero incidents

Project details
  • , Categories:
  • Client:City of Chicago
  • Location:Chicago, Illinois
  • Contract Value:$2,400,000
  • Completion Date:September, 2012